== Project Schedule  ==
 
== Project Schedule  ==
 +
Proposed: start 01 Jan 2019, delivery 04 May 2020. See timeline in bid.  Note that paperwork was not signed until 01 March 2019, so there is an anticipated delay.
 +
[[File:Screen Shot 2019-11-18 at 11.48.27.jpg||500px|center]]
 +
 +
== Lens Coatings and Andor CCD  ==
 
Proposed: start 01 Jan 2019, delivery 04 May 2020. See timeline in bid.  Note that paperwork was not signed until 01 March 2019, so there is an anticipated delay.
 
Proposed: start 01 Jan 2019, delivery 04 May 2020. See timeline in bid.  Note that paperwork was not signed until 01 March 2019, so there is an anticipated delay.
 
[[File:Screen Shot 2019-11-18 at 11.48.27.jpg||500px|center]]
 
[[File:Screen Shot 2019-11-18 at 11.48.27.jpg||500px|center]]

Revision as of 15:08, 17 January 2020

Lesedi Project Wiki

  • This wiki is for construction of a spectrograph on the 1-m Lesedi telescope in Sutherland. We anticipate future wikis for the user manual and for technical support.
  • The SAAO and LJMU (Liverpool John Moores University) are collaborating on the project.
  • The instrument is based on SPRAT (Spectrograph for Rapid Acquisition of Transients), which is currently operating robotically on the 2-m Liverpool Telescope on La Palma.
LesediSpecPromo.JPG

Project Team

Instrument PI: Iain Steele (LJMU; I.A.Steele@ljmu.ac.uk)

Instrument Scientists: Helen Jermak (h.e.jermak@ljmu.ac.uk)/ Andrjez Piascik (LJMU; A.S.Piascik@ljmu.ac.uk)

Mechanical Engineer: Stuart Bates (LJMU; S.D.Bates@ljmu.ac.uk)

Software Engineer: Chris Mottram (LJMU; C.Mottram@ljmu.ac.uk)

Data Pipeline: Marco Lam (LJMU; C.Y.Lam@ljmu.ac.uk)

Local Co-PIs: Amanda Sickafoose (amanda@saao.ac.za) & Hannah Worters (hannah@saao.ac.za)

Local Electronics Engineer: Hitesh Gajjar (hitesh@saao.ac.za)

Local Mechanical Engineesr:James O'Connor (joc@saao.ac.za) and Egan Loubser (egan@saao.ac.za)

Local Software Engineer: Carel van Gend (carel@saao.ac.za)

Documentation

Notes from meetings

18 Nov. 2019

01 Feb 2019

27 Oct. 2018

SHOC/SPRAT hybrid

  • Point was raised that (rather than comount SHOC and this new spectrograph) we could use an iXon camera in the SPRAT system, add filter wheels, and effectively use it as SHOC when the slit, grating, and prisms are out of beam. The iXon has 1024 x 13-micron pixels as opposed to the iDus 1024 x 26-micron pixels. A test was performed at LT in the week of 15 Dec., in which the 85 mm f/1.8 camera lens was swapped out with a 50 mm Nikon f/1.4. The result from an arc was 7.70 Å/channel, central wavelength 6009.04 Å, range 4073.64 – 8018.33 Å. This range could be tweaked by tilting the camera slightly.

Some more details 50mmLensTest

  • Point raised by Stu at 12 Feb. 2019 Skype about filter wheel insertion into collimated beam causing flexture. James thinks that if the design can stay within the original structure envelope, and we are smart about orientation, the current stiffness might suffice. Alternatives to consider are (1) mounting a filter wheel near the entrance to the instrument or (2) separate SPRAT/SHOC mountings, by removing SPRAT and disconnecting the camera to reattach on the port.

Spreadsheet of pros/cons for proposed mounting options

LesediSpec.Mounting1.jpg

Project Schedule

Proposed: start 01 Jan 2019, delivery 04 May 2020. See timeline in bid. Note that paperwork was not signed until 01 March 2019, so there is an anticipated delay.

Screen Shot 2019-11-18 at 11.48.27.jpg

Lens Coatings and Andor CCD

Proposed: start 01 Jan 2019, delivery 04 May 2020. See timeline in bid. Note that paperwork was not signed until 01 March 2019, so there is an anticipated delay.

Screen Shot 2019-11-18 at 11.48.27.jpg