,'''On the Telescope:'''
# Ensure that the telescope is switched OFF
# Mount the instrument on the telescope (mechanical responsibility)
# Mount XYslide and Acquisition/autoguider camera
# Connect cabling and services:
* At the instrument services panel (Fig. 2), connect the instrument mains supply, compressed air feed, and RS232 comms cable.
* Check that the air pressure is 600KPa at the south pier and 300KPa on the instrument. See Fig. 5
* The USB cable to the Lodestar acquisition camera.
* XY slides cables (x4)
* Dual optical fibre to the SDSU CCD controller. (Note that the SDSU fibre is an individual dual fibre cable fed thru the axis). Note the colour coding for the SDSU fibre (Rx cable connector is marked ‘R’) – see Fig. 3.
* Connect the PLC RS232 cable to the RS232 connection point at the NW corner of the mirror cell.
* Connect the rear-of-slit viewing camera USB cable to the USB/fibre convertor in the fibre box on the east side of the mirror cell.
# Power up:
* SDSU PSU (only 3 leds will be on – see Fig. 4)
* XY-Slides (south side of telescope - see Fig. 6)