Changes

Jump to: navigation, search

SPUPNIC

311 bytes added, 14:24, 11 October 2023
/* Change Log */
== Change Log ==
*'''October 2023:''' The new autoguider that forms part of the instrument selector to accommodate both SpUpNIC and SHOC has been commissioned. There are slight changes to the operation of the autoguider, and '''observers now needs to connect to a new TCS PC (tcs74v4.suth) to use the telescope with SpUpNIC'''.
*'''27 September 2017:''' SpUpNIC back in service after fixing a bad connection within the pre-amp electronics. On 8 September the detector began producing only zeros and after extensive trouble-shooting, the detector package was removed from the instrument (on 13 September) and sent down to Cape Town for further investigation and subsequent repair. A total of 12 scheduled nights were lost to this extremely serious failure (although the two observers affected worked with SHOC instead).
*'''3 August 2017:''' Completed extensive testing of various gratings (particularly G7) in order to characterise the ghosting issues reported previously.
1,054
edits