Changes

Jump to: navigation, search

74 Inch

774 bytes removed, 10:54, 5 May 2016
|
|}
Items to check Checked
Instrument on telescope
Lodestar Acq. Camera/XY slide mounted & connected
Lodestar rear-of-slit camera mounted & connected
PLC comms connected
Science CCD comms connected
All subsystems powered up
Functional tests, PLC:
• Offset guide mirror IN/OUT
• Comparison mirror IN/OUT
• Arc Lamps 1 & 2 ON/OFF
• Slit illumination ON/OFF
• Hartmann shutters A & B IN/OUT
• Rear of slit mirror IN/OUT
• Grating angle adjustment
• Slit width adjustment
• Filter wheel selection
Functional tests, Science Detector:
• CCD readout – bias frame
• CCD readout – ARC image
Functional tests, TCS:
• XYslide reset/position initialize
• Acq. Camera imaging – view the slit
Functional test, rear-slit viewing camera:
• Image shows the slit
''TODO: CLI startup & general computer interaction''
[[File:Example.jpg|thumbnail]]
Note in Fig. 1 keyboard/mouse peripherals have been omitted for clarity
'''Vacuum Pumping and LN2 filling:'''1. # The day before, connect the vacuum pump using the 500mm long vacuum hose (see Fig. 1) and pump-down overnight. 2. # The next morning, check that the vacuum got down to the 10-6 mbar range.3. # Shortly before mounting the instrument, while still vacuum pumping, start filling the cryostat with LN2.  
4. After the first flask, close the cryostat vacuum valve and stop the pump.
5. Continue filling slowly until full, indicated by LN2 boiling in the outer funnel. When full, using a glove, quickly remove the inner funnel and dump the excess LN2 back in the filling flask.
38
edits