/* Window */
Here you will set the times within which your observation may be scheduled.  The wider the window, the greater the scheduling opportunities, so it's advisable not to restrict it unnecessarily. You have the option to specify one window; multiple discrete windows; or multiple windows at a specified interval. For each window, (a maximum of) one observation will be scheduled. The dates need to be within the quadrimester to which your proposal has time allocated. Windows are specified with the following parameters:
*'''Start''': Select the earliest date and time (in UT) that the observation may start. These can be selected from a calendar, so you don't need to worry about the format.
*'''End''': Enter the end date and time (in UT) for the observation window.  For an observation with no specific time constraints, the window could be as wide as the full season that the target is visible, to allow the greatest chance of it being observed.  For a time-critical observation, the window should only cover the duration of the event, plus overheads. 
1,210
edits