Changes

Jump to: navigation, search

74 Inch

1 byte added, 12:14, 19 May 2016
==='''Vacuum Pumping and LN2 filling:'''===
# The day before, connect the vacuum pump using the 500mm long vacuum hose (see Fig. 1) and pump-down overnight.
# The next morning, check that the vacuum got down to the 10-6 mbar range.
38
edits