Changes

19 June 2020

641 bytes added, 12:16, 19 June 2020
First issue
1. Cables<br/>
*Possibility of smaller cable for LAC power and arduino was investigated - conclusion is to keep the original 20AWG cable originally specified and find a suitable connector to go with it.<br/>
<br/>
2. Acceptance Test Procedure<br/>
*[https://docs.google.com/spreadsheets/d/1_BGSkiD5Mb6yQtRGOAf8hyP0XpOCU_oFgQFN5Z-Y4dQ/edit?usp=sharing Draft lab ATP for comment]<br/>
*ATP distributed for review/comment at next meeting.<br/>
*When developing, NB to include the methods by which these various aspects will be tested.<br/>
<br/>
3. Items ordered<br/>
*Filters have arrived in SA.<br/>
*i7 mini-desktop PC has been ordered.<br/>
51
edits