Changes

6 Feb 2020

596 bytes added, 13:34, 6 March 2020
completed minutes
1. Mechanical design and interfaces<br/><li>Filter slides in detailed stages. Stuart to create a step file from the Zemax with fixed workplanes to aid referencing individual CAD assemblies.<br/><li>Kathryn to set up interactive cable/equipment list based on Coggle diagram received, detailing by all parties</li><br/>2. Parts procurement<br/><li>Nikon has been received<li>CCD has been ordered from Andor<br/><br/>3. Software<br/><li>Software working group to be formed, first meeting in the 1200 SAST time slot on 2020/03/13. Carel will invite the relevant SAAO parties.<br /><li>Draft functionality requirements from SAAO side to be developed during the course of the week, for discussion Friday - Carel to distribute<br/><li>Draft capabilities and any interactive requirements from LJMU side to be developed (i.e. what commands and information do LJMU currently expect the instrument to issue)<br/><br/>4. Slit<br/><li>SAAO to discuss slit requirements<br/><li>LJMU manufacture these in house, so it can be anythingconfiguration<br/><li>Iain distributed an example multi-width slit arrangement they have in use[[File:slit_example_iain_20200306.png|thumbnail]]<br/>5. Schedule and reviews<br/><li>A hardware design review is required to push forward on manufacturing - target end March<br/><li>Durations estimates from LJMU:<br/><li>From design review ~ 2 months for hardware manufacture<br/><li>From manufacture ~ 2 months for setup and lab testing<br/><li>Software effort unknown at this stage<br/><li>Area on wiki to be set up with FAT topics & prelim delivery placeholders (Kathryn)<br/>
51
edits