Difference between revisions of "6 Feb 2020"
From SAAO TOPS Wiki
(Created meeting notes) |
m (typo) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | 1. Mechanical design and interfaces | + | 1. Mechanical design and interfaces<br/> |
− | Filter slides in detailed stages. Stuart to create a step file from the Zemax with fixed workplanes to aid referencing individual CAD assemblies. | + | <li>Filter slides in detailed stages. Stuart to create a step file from the Zemax with fixed workplanes to aid referencing individual CAD assemblies.<br/> |
− | Kathryn to set up interactive cable/equipment list based on Coggle diagram received, detailing by all parties | + | <li>Kathryn to set up interactive cable/equipment list based on Coggle diagram received, detailing by all parties</li> |
− | + | <br/> | |
− | 2. Parts procurement | + | 2. Parts procurement<br/> |
− | Nikon has been received | + | <li>Nikon has been received |
− | CCD has been ordered from Andor | + | <li>CCD has been ordered from Andor |
− | + | <br/><br/> | |
− | 3. Software | + | 3. Software<br/> |
− | Software working group to be formed, first meeting in the 1200 SAST time slot on 2020/03/13. Carel will invite the relevant SAAO parties. | + | <li>Software working group to be formed, first meeting in the 1200 SAST time slot on 2020/03/13. Carel will invite the relevant SAAO parties.<br /> |
− | Draft functionality requirements from SAAO side to be developed during the course of the week, for discussion Friday - Carel to distribute | + | <li>Draft functionality requirements from SAAO side to be developed during the course of the week, for discussion Friday - Carel to distribute<br/> |
− | Draft capabilities and any interactive requirements from LJMU side to be developed (i.e. what commands and information do LJMU currently expect the instrument to issue) | + | <li>Draft capabilities and any interactive requirements from LJMU side to be developed (i.e. what commands and information do LJMU currently expect the instrument to issue) |
− | + | <br/><br/> | |
− | 4. Slit | + | 4. Slit<br/> |
− | SAAO to discuss slit requirements | + | <li>SAAO to discuss slit requirements<br/> |
− | LJMU manufacture these in house, so it can be | + | <li>LJMU manufacture these in house, so it can be any configuration<br/> |
− | Iain distributed an example slit arrangement they have in use | + | <li>Iain distributed an example multi-width slit arrangement they have in use |
− | + | [[File:slit_example_iain_20200306.png|thumbnail]] | |
− | + | <br/> | |
− | 5. Schedule and reviews | + | 5. Schedule and reviews<br/> |
+ | <li>A hardware design review is required to push forward on manufacturing - target end March<br/> | ||
+ | <li>Durations estimates from LJMU:<br/> | ||
+ | <li>From design review ~ 2 months for hardware manufacture<br/> | ||
+ | <li>From manufacture ~ 2 months for setup and lab testing<br/> | ||
+ | <li>Software effort unknown at this stage<br/> | ||
+ | <li>Area on wiki to be set up with FAT topics & prelim delivery placeholders (Kathryn)<br/> |
Latest revision as of 09:22, 9 March 2020
1. Mechanical design and interfaces
2. Parts procurement
3. Software
4. Slit
5. Schedule and reviews